Barn Repair

Above is the construction site on the south side of the hay loft in the barn.  Below is the north side.  

Here is the barn with the tarps on it, protecting the contents from the rain.

This is the lower level roof being replaced by my brother, husband and father.

The upper level roof is mostly done, and the lower level one is framed.

This is the construction site inside the lower level of the barn.

Here is the new lower barn roof from the inside.

This is the inside of the new upper level roof.

And here is the new wall upstairs.

This is the debris from the cottonwood and the new, much smaller, temporary donkey pen.

Here is my brother Greg replacing the ridgecap on the roof.

And this is the final push to get the barn done.

And here is the barn all repaired, 9 days after it was crushed by the large cottonwood tree.  It is like it never happened!

Advertisements
This entry was posted in Farm. Bookmark the permalink.

6 Responses to Barn Repair

  1. Michelle says:

    That’s fantastic, Donna! So wonderful that you have helpful family!

    Like

  2. mcfwriter says:

    Nice job! I am so glad you were able to get it repaired so quickly!

    Like

  3. Denise says:

    well done. thank goodness you have a very handy repair crew!

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s